Tuesday, 11 December 2018

Block work moves forward at a steady rate.

The walls of the extension continue to rise, if somewhat slowly. The first snap below is from the front of the house, from the road. The two apertures will form windows for the guest bedroom. The run of the wall that joins the original structure on the right is where the guest bedroom en-suite will be,

The snap beneath that is from the side of the house. The right hand aperture will also be part of the guest bedroom and be formed as french windows. The aperture on the left is where the new front door will be. SO, this "side" of the house, will become the "front" of the house with both pedestrian and vehicle access being from / to here.
From here on they are going to need scaffolding.

No comments:

Post a Comment