Despite a wet and windy day the concrete for the ground floor was poured on Friday. The left-hand picture is where the main bedroom en-suite will be located. The middle picture is where the main bedroom will be. There are no joists in yet so the view is of the two storeys. The lower window is to bee converted into the entrance into the en-suite. The right-hand picture is looking across the guest bedroom. The pipes that are sticking up from the cpnrte are where a space will be enclosed to create an en-suite.
The picture below records the creation of a new window in the original structure. This is in the corner of what was the lounge that will become the 3rd bedroom. This is the first time that the original structure had an opening, giving a view towards Mount Brandon. Unfortunately the day that is in it, means the view is a tad obscured by the clouds