Most of the walls and all the ceilings are being painted the same colour, prosaically called RAL 9002. It coordinates with the colour of the window frames. The ceilings are all done to a finish and the first, mix coat has been applied to all the walls. The walls will need to be hand-finished when the joinery second fix has been done. This is due to be underway on January 20th.
Next Monday will see the start of the tiling. All the floors, except the bedrooms, are being tiled so there is something like 140sqm to be done.
This snap will give you an idea of the wall colour - it catches the view from the two main windows in the sitting room.